Completed Projects
Sydney International Aquatic Centre (May 2000 Dec 2000)
Stage 1
Client: Olympic Co-Ordination Authority
Aquatic Consulting Engineers: Geoff Ninnes Fong & Partners
Trisley Hydraulic Services
Project Manager: Robert Trisley
Scope of Works
To provide backup filtration systems for the Competition pool and Diving Pool at the 2000 Olympic Games. This included the installation of two 750m3/hr UFF/Ozone plants and a 25m3/hr UFF/UV filtration plant.Tender Process
After an exhaustive Australia wide pre-tender review, four tenderers were considered to have the capacity to complete the Design and Construction works required. The tender review was based not only on price but also included technical expertise, project management skills, manpower, innovative design and financial capacity.
Project Details
As the existing filtration plants were located some 6m below deck level with limited access (3.5m x 3.5m access hatches) the filtration plants not only had to deal with the limited access available but also would meet the most stringent water quality standards as required by FINA.Sydney International Aquatic Centre (May 2000 Dec 2000)
Stage 2
Client: Olympic Co-Ordination Authority
Trisley Hydraulic Services
Design Team: Geoff Ninnes Fong & Partners / Fulham Engineering / Robert Trisley
Scope of Works
To provide new filtration systems for the Competition pools at the 2000 Olympic Games. This included the installation of a 750m3/hr UFF/Ozone, 600m3/hr UFF/Ozone and 25m3/hr UFF/UV (Stage 1) filtration plants. Post Olympic works included the installation of 2 x 600m3/hr UFF/UV and 100m3/hr UFF/UV filtration plant.Project Details After being awarded the initial works and commencing on site, major flaws were found in the existing filtration systems. The OCA after advice from the Aquatic Engineering Consultant, asked our Company to submit a proposal to replace all of the filtration plants in the Centre. We engaged Fulham Engineering Services Pty Ltd as our design consultants. To provide the necessary and important overall Project co-ordination, Quality control & Engineering backup, Geoff Ninnes Fong & Partners were engaged by Fulham Engineering Services as a sub consultant.
Cook & Phillip Park Aquatic Centre (Feb 2002 May 2003)
Stages 1 & 2
Client: City of SydneyTrisley Hydraulic Services
Project Manager: Robert Trisley
Scope of Works
Stage 1 was to provide new UV systems for the 50m pool, Leisure Pool and Hydrotherapy pool whilst keeping the Centre open to the public. Stage 2 was to increase the filter area for the 50m pool. New pipework for the Leisure pool and an entirely new filtration plant for the Hydrotherapy pool. This included the installation of an additional 5m2 filter for the 50m pool and a 20m2 UFF filter for the Hydrotherapy pool. As the Centre was utilising Ozone, all of the redundant Ozone plant including generators and carbon filters had to be removed.Project Details
As the existing filtration plants were located some 4m below deck level with limited access (3m x 3m access hatches) our program of works not only to deal with the limited access but also would meet the clients demand that the pools were to stay operational during the works period.
Kalgoorlie Aquatic Centre (May 1998 Dec 1999)
Trisley Hydraulic Services
Project Manager: Robert TrisleyScope of Works
To provide filtration systems for a major regional Aquatic Centre. This included the installation of a 500m3/hr Sand/UV, 300m3/hr Sand/UV and 2 x 40m3/hr UFF filtration plants. The Centre also had a water slide included in the design.Tender Process
This project was a Design and Construct project, the Builder and Architect put forward a filtration design that was fully documented by the Aquatic Design Engineer. Our role was to provide a competitive price that assisted in winning the project.Project Details
Kalgoorlie lies some 600km east of Perth, WA. Being in a remote location meant that the filtration plants needed to be reliable. As well as reliability, the general location is well known for the high levels of air-borne dust, which needed to be accounted for in the filtration process.
Bunbury Aquatic Centre (Feb 2001 Projected Completion Nov 2001)
Client: Consolidated Constructions
Project Architect: Peter Hunt Architects
Consulting Aquatic Engineers: Geoff Ninnes Fong & Partners
Project Value: $0.8m
Trisley Hydraulic Services
Project Manager: Robert TrisleySite Manager: Rodney Borra
Scope of Works
To provide filtration systems for a major regional Aquatic Centre. This includes the installation of a 575m3/hr Sand/UV, 300m3/hr Sand/UV and 1 x 25m3/hr UFF filtration plants. The Centre also had a water slide included in the design.
Tender Process
We provided a filtration price in competition with other filtration installers to the builder. The price was based on a fully documented design by Geoff Ninnes Fong & Partners. Our installation price could be demonstrated to provide water quality and plant costs that would meet the expectations of both the builder and end user. With some initial budget constraints placed upon the builder, we developed the design with only minor modifications to meet cost concerns without sacrificing water quality.
Project Details
Bunbury is located 220km south of Perth, WA. Bunbury is a growth area of the State and the addition of the new Aquatic Centre provides the population with an attractive asset. The pools will be well patronised, so the plants have been designed for medium to high bather loads. Client: Consolidated Constructions
Trisley Hydraulic Services
Project Manager: Robert TrisleyScope of Works
To provide filtration systems for a major regional Aquatic Centre. This included the installation of a 500m3/hr Sand, 300m3/hr Sand/UV, 270m3/hr UFF/UV, 60m3/hr UFF/UV & 40m3/hr UFF/UV filtration plants. The Centre also had a water slide included in the design.
Tender Process
As this project was a Design and Documented project, our Company worked hard to deliver a tender price that was competitive.
Project Details
Warnbro lies some 60km south of Perth, WA. Being in a regional location, meant that the filtration plants needed to be reliable. As well as reliability, the Warnbro area is one of the fastest growing areas of the greater Perth area. This meant that the pools would be heavily utilised so water quality during peak loads was to be a consideration. Sutherland Aquatic Centre (Feb 1999 Oct 1999)
Client: Sutherland Council
Trisley Hydraulic Services
Design Team: Fulham Engineering / Robert Trisley
Project Manager: Robert Trisley
Scope of Works
To provide replacement filtration systems and refurbishment for a major Sydney Aquatic Centre. This includes the installation of an 850m3/hr Sand/Ozone and 60m3/hr Sand/Ozone filtration plants. The Centre also had major problems in respect of reticulation, which needed to be addressed. The pools interior was tired an in need of a new surface.
Tender Process
The project was of a design and construct nature. After pre-tender competition, our Company along with Swimplex Pty Ltd were invited to provide Council with a design that would provide solutions to the water quality, reticulation and interior surfacing problems that the Centre was experiencing. Our design and pricing for the project was seen as providing the most innovative solutions and our Company was awarded the contract.
Project Details
We provided a filtration design that maintained some of the existing plant and incorporated a new Ozone filtration process to take into account the very high bather loads of the Centre. The 850m3/hr system installed provides the Centre with a turnover time of 1.4hrs. This pool has an average bather load of over 2,500 bathers each day.Lane Cove Aquatic Centre (June 2000 June 2001)
Client: Belmadar Constructions
Trisley Hydraulic Services
Project Manager: Robert Trisley
Scope of Works
To provide filtration systems for an indoor Aquatic Centre for the Lane Cove Council. This includes the installation of a 250m3/hr UFF/UV, 420m3/hr Sand/UV, 100m3/hr UFF/UV and 40m3/hr UFF/UV filtration plants.
Tender Process
The building project was a design and documented project with the pool filtration plant being a nominated sub-contract based on a fully documented design by the project Aquatic Engineer. Once the builder was selected, some project cost concerns were encountered. We then worked intensely with the Builder, Architect and Engineer along with other parties to provide innovative solutions. After several design options were discussed, a filtration proposal that was only altered in a minor way was found acceptable to all parties and was agreed upon.
Project Details
Geoff Ninnes Fong & Partners provided a filtration design that assessed the bathing loads that were expected in the Centre and as a result, both Sand and UFF filtration was utilised. Underlying all of the plants, UV sterialisation was used to assist in water quality.
Other projects in which our Company has been responsible for installing that detail our depth of experience in the commercial pool industry.
UFF / Ozone YEAR
2000 Olympics (Stage 1) 2 x 600m3/hr system 2000
Aquatic Engineer Geoff Ninnes Fong & Partners
2000 Olympics (Stage 2) 1 x 750m3/hr system 2000
Aquatic Engineer Fulham Engineering Services Trisley Hydraulic Services
2000 Olympics 1 x 600m3/hr system 2000
Aquatic Engineer Fulham Engineering Services Trisley Hydraulic Services
Pre-coat / UV projects
Inglewood Aquatic Centre 1 x 25m3/hr system 2000
Aquatic Engineer Geoff Ninnes Fong & Partners
Danebank Girls School 1 x 75m3/hr system 2000
Aquatic Engineer Geoff Ninnes Fong & Partners
Pump House Hotel 1 x 40m3/hr system 1998
Aquatic Engineer Robert Trisley
Kalgoorlie Aquatic Centre 2 x 40m3/hr system 1999
Aquatic Engineer Geoff Ninnes Fong & Partners
St Marys Hydrotherapy 1 x 150m3/hr system 2001
Aquatic Engineer Stevenson & Associates
Bunbury Aquatic Centre 1 x 25m3/hr system 2001
Aquatic Engineer Geoff Ninnes Fong & Partners
Menai Learn to Swim 1 x 200m3/hr system 2001
Designer Robert Trisley
Warnbro Aquatic Centre 1 x 270m3/hr system 2002
Aquatic Engineer Geoff Ninnes Fong & Partners
Warnbro Aquatic Centre 1 x 60m3/hr system 2002
Aquatic Engineer Geoff Ninnes Fong & Partners
Warnbro Aquatic Centre 1 x 30m3/hr system 2002
Aquatic Engineer Geoff Ninnes Fong & Partners
2000 Olympics 2 x 600m3/hr system 2000
Aquatic Engineer Fulham Engineering Services
2000 Olympics 1 x 100m3/hr system 2000
Aquatic Engineer Fulham Engineering Services
2000 Olympics 1 x 25m3/hr system 2000
Aquatic Engineer Geoff Ninnes Fong & Partners
Lane Cove Aquatic Centre 1 x 250m3/hr system 2001
Aquatic Engineer Geoff Ninnes Fong & Partners
Lane Cove Aquatic Centre 1 x 100m3/hr system 2001
Aquatic Engineer Geoff Ninnes Fong & Partners
Lane Cove Aquatic Centre 1 x 40m3/hr system 2001
Aquatic Engineer Geoff Ninnes Fong & Partners
Carlile swim Centre 1 x 250m3/hr system 2002
Aquatic Engineer Fulham Engineering Services
Cook & Phillip Park 1 x 100m3/hr system 2002
Aquatic Engineer Stevenson & Associates
Gosnells Leisure Centre 1 x 60m3/hr system 2003
Aquatic Engineer Geoff Ninnes Fong & Partners
Cienna Apartments 1 x 270m3/hr system 2003
Aquatic Engineer Acor Consultants
Castle Hill RSL 1 x 290m3/hr system 2003
Aquatic Engineer Stevenson & Associates
Castle Hill RSL 1 x 70m3/hr system 2003
Aquatic Engineer Stevenson & Associates
Castle Hill RSL 1 x 50m3/hr system 2003
Aquatic Engineer Stevenson & Associates
Castle Hill RSL 1 x 28m3/hr system 2003
Aquatic Engineer Stevenson & Associates
Mayne Health 1 x 30m3/hr system 2003
Aquatic Engineer Trisley Hydraulic Services
St George School 1 x 40m3/hr system 2003
Aquatic Engineer Stevenson & Associates
Quarterdeck 1 x 120m3/hr system 2004
Aquatic Engineer Stevenson & Associates
Hurstville Leisure Centre 1 x 30m3/hr system 2004
Aquatic Engineer Geoff Ninnes Fong & Partners
Hurstville Leisure Centre 1 x 120m3/hr system 2004
Aquatic Engineer Geoff Ninnes Fong & Partners
Hurstville Leisure Centre 1 x 10m3/hr system 2004
Aquatic Engineer Geoff Ninnes Fong & Partners
Cook & Phillip Park 1 x 100m3/hr system 2003
Aquatic Engineer Stevenson & Associates
Springwood Aquatic Centre 1 x 330m3/hr system 2004
Aquatic Engineer Stevenson & Associates
Springwood Aquatic Centre 1 x 330m3/hr system 2004
Aquatic Engineer Stevenson & Associates
Springwood Aquatic Centre 1 x 230m3/hr system 2004
Aquatic Engineer Stevenson & Associates
Springwood Aquatic Centre 1 x 30m3/hr system 2004
Aquatic Engineer Stevenson & Associates
Dubbo RSL 1 x 252m3/hr system 2004
Aquatic Engineer Stevenson & Associates
Gosnells Leisure Centre 1 x 450m3/hr system 2005
Aquatic Engineer Geoff Ninnes Fong & Partners
Bayswater Aquatic Centre 1 x 450m3/hr system 2005
Aquatic Engineer Stevenson & Associates
Bayswater Aquatic Centre 1 x 100m3/hr system 2005
Aquatic Engineer Stevenson & Associates
Bayswater Aquatic Centre 1 x 70m3/hr system 2005
Aquatic Engineer Stevenson & Associates
Cherrybrook Swim School 1 x 300m3/hr system 2005
Aquatic Engineer Fulham Engineering
Cherrybrook Swim School 1 x 150m3/hr system 2005
Aquatic Engineer Fulham Engineering
PLC College 1 x 360m3/hr system 2005
Aquatic Engineer Stevenson & Associates
Ashfield Hospital 1 x 80m3/hr system 2005
Aquatic Engineer Trisley Hydraulics
Holsworthy Army Base 1 x 100m3/hr system 2005
Aquatic Engineer Trisley Hydraulics
Cienna Apartments 1 x 300m3/hr system 2004
Aquatic Engineer Acor
Fairfield Aquatic Centre 1 x 300m3/hr system 2006
Aquatic Engineer Stevenson & Associates
Mounties 1 x 300m3/hr system 2006
Aquatic Engineer Stevenson & Associates
Mounties 1 x 100m3/hr system 2006
Aquatic Engineer Stevenson & Associates
Oakhill College 1 x 360m3/hr system 2006
Aquatic Engineer Stevenson & Associates
Westmead Hospital 1 x 120m3/hr system 2006
Aquatic Engineer Stevenson & Associates
Kingswim 1 x 300m3/hr system 2006
Aquatic Engineer Trisley Hydraulics
Fitness First 1 x 100m3/hr system 2007
Aquatic Engineer THS
Whitlam Aquatic Centre 1 x 100m3/hr system 2007
Aquatic Engineer Geoff Ninnes Fong & Partners
Pre-coat projects
AJC Randwick 1 x 120m3/hr system 2002
Aquatic Engineer Trisley Hydraulic Services
Shoalhaven Council 1 x 200m3/hr system 2002
Aquatic Engineer Trisley Hydraulic Services
Goldsborough Mort 1 x 50m3/hr system 2003
Aquatic Engineer Stevenson & Associates
Carlisle Centre 1 x 50m3/hr system 2004
Design Trisley Hydraulics
Tomaree /aquatic Centre 1 x 450-600m3/hr system 2004
Aquatic Engineer Fulham engineering Services
Blackheath Leisure Centre 1 x 750m3/hr system 2005
Aquatic Engineer Stevenson & Associates
Blackheath Leisure Centre 1 x 125m3/hr system 2005
Aquatic Engineer Stevenson & Associates
Victoria Park Aquatic Centre 1 x 750m3/hr system 2005
Aquatic Engineer Geoff Ninnes Fong & Partners
Victoria Park Aquatic Centre 1 x 100m3/hr system 2005
Aquatic Engineer Geoff Ninnes Fong & Partners
Killarney Swim Centre 1 x 300m3/hr system 2005
Aquatic Engineer Fulham Engineering
Manly Aquatic Centre 1 x 250m3/hr system 2007
Aquatic Engineer Stevenson & Associates
Sand / UV projects
Kalgoorlie Aquatic Centre 1 x 500m3/hr system 1999
Aquatic Engineer Geoff Ninnes Fong & Partners
Kalgoorlie Aquatic Centre 1 x 300m3/hr system 1999
Aquatic Engineer Geoff Ninnes Fong & Partners
Inglewood Aquatic Centre 2 x 250m3/hr systems 2000
Aquatic Engineer Geoff Ninnes Fong & Partners
Jacksons Landing 1 x 150m3/hr system 2001
Aquatic Engineer Stevenson & Associates
Subiaco Oval 1 x 300m3/hr system 1999
Aquatic Engineer Geoff Ninnes Fong & Partners
Duntroon Military College 1 x 50m3/hr system 1995
Aquatic Engineer Geoff Ninnes Fong & Partners
All Saints College 1 x 320m3/hr system 2002
Aquatic Engineer Geoff Ninnes Fong & Partners
St Brigids College 1 x 300m3/hr system 2002
Aquatic Engineer Geoff Ninnes Fong & Partners
Warnbro Aquatic Centre 1 x 600m3/hr system 2002
Aquatic Engineer Geoff Ninnes Fong & Partners
Warnbro Aquatic Centre 1 x 450m3/hr system 2002
Aquatic Engineer Geoff Ninnes Fong & Partners
Bunbury Aquatic Centre 1 x 575m3/hr system 2001
Aquatic Engineer Geoff Ninnes Fong & Partners
Bunbury Aquatic Centre 1 x 300m3/hr system 2001
Aquatic Engineer Geoff Ninnes Fong & Partners
Lane Cove Aquatic Centre 1 x 420m3/hr system 2001
Aquatic Engineer Geoff Ninnes Fong & Partners
Wollondilly Shire Council 1 x 500m3/hr system 2002
Aquatic Engineer Fulham Engineering Services
Cook & Phillip Park 1 x 750m3/hr system 2003
Aquatic Engineer Stevenson & Associates
Cook & Phillip Park 1 x 420m3/hr system 2003
Aquatic Engineer Stevenson & Associates
Prairiewood Aquatic Centre 1 x 450m3/hr system 2005
Aquatic Engineer Stevenson & Associates
Fitness First 1 x 300m3/hr system 2005
Aquatic Engineer Trisley Hydraulics
Bayswater Aquatic Centre 1 x 750m3/hr system 2005
Aquatic Engineer Stevenson & Associates
Lakeside Leisure Centre 1 x 750m3/hr system 2004
Aquatic Engineer Trisley Hydraulics
Lakeside Leisure Centre 1 x 450m3/hr system 2004
Aquatic Engineer Trisley Hydraulics
Ultimo Aquatic Centre 1 x 750m3/hr system 2006
Aquatic Engineer BECA
Ultimo Aquatic Centre 1 x 140m3/hr system 2006
Aquatic Engineer BECA
Ultimo Aquatic Centre 1 x 110m3/hr system 2006
Aquatic Engineer BECA
Chisholm College 1 x 320m3/hr system 2006
Aquatic Engineer Geoff Ninnes Fong & Partners
Bathurst Aquatic Centre 1 x 380m3/hr system 2007
Aquatic Engineer Geoff Ninnes Fong & Partners
Bathurst Aquatic Centre 1 x 360m3/hr system 2007
Aquatic Engineer Geoff Ninnes Fong & Partners
Bathurst Aquatic Centre 1 x 31m3/hr system 2007
Aquatic Engineer Geoff Ninnes Fong & Partners
Sand / Ozone projects
Prairievale Aquatic Centre 1 x 400m3/hr system 1994
Aquatic Engineer Trisley Hydraulic Services
Hurstville Aquatic Centre 1 x 420m3/hr system 1995
Aquatic Engineer Geoff Ninnes Fong & Partners
Manors of Mosman 1 x 100m3/hr system 1997
Aquatic Engineer Geoff Ninnes Fong & Partners
Sylvanvale Handicapped 1 x 100m3/hr system 1996
Aquatic Engineer Robert Trisley
Holsworthy Field hospital 1 x 120m3/hr system 1996
Aquatic Engineer Geoff Ninnes Fong & Partners
Sutherland Leisure Centre 1 x 850m3/hr system 1999
Aquatic Engineer Trisley Hydraulic Services
Sutherland Leisure Centre 1 x 60m3/hr system 1999
Aquatic Engineer Trisley Hydraulic Services
Sand projects
Cairns City Council 1 x 800m3/hr system 2003
Aquatic Engineer Stevenson & Associates
Wollondilly Shire Council 1 x 500m3/hr system 2003
Aquatic Engineer Fulham Engineering
Warnbro Aquatic Centre 1 x 500m3/hr system 2003
Aquatic Engineer Geoff Ninnes Fong & Partners
Claremont Aquatic Centre 1 x 450m3/hr system 2003
Aquatic Engineer Geoff Ninnes Fong & Partners
Kununurra Leisure Centre 1 x 150m3/hr system 2003
Aquatic Engineer Geoff Ninnes Fong & Partners
Kununurra Leisure Centre 1 x 200m3/hr system 2003
Aquatic Engineer Geoff Ninnes Fong & Partners
Mt Newman Aquatic Centre 1 x 500m3/hr system 2002
Aquatic Engineer Geoff Ninnes Fong & Partners
Leonora Aquatic Centre 1 x 400m3/hr system 2005
Aquatic Engineer Donovan Payne Architects
Paraburdoo Aquatic Centre 1 x 400m3/hr system 2007
Aquatic Engineer Geoff Ninnes Fong & Partners
Bathurst Aquatic Centre 1 x 810m3/hr system 2007
Aquatic Engineer Geoff Ninnes Fong & Partners