QLD Projects

Trisley Hydraulic Services has been at the forefront of the filtration installation market for a considerable length of time. During that time we have seen many different brands of filters, pumps, chemical dosing systems etc. and we have a definite opinion as to the quality of equipment being used in the marketplace.

Importantly we are the only filtration contractor that has a dedicated service arm, which consists of a preventative maintenance contracts department, as well as a reactive maintenance department. This has allowed us to see how products perform over a long period of time and as a result, we have aligned ourselves to suppliers of equipment that have a proven record over an extended period.

Some of our most recently completed projects include

  • Centenary Aquatic & Sports Complex
  • Colmslie Leisure Centre
  • Dunlop Aquatic Centre
  • Dunlop Park Aquatic Centre
  • Emerald Aquatic Centre
  • Ferny Hill Aquatic Centre
  • Gallipoli Barracks Army Base
  • Gatton University
  • Gold Coast Aquatic Centre
  • Hibiscus Sports Centre – Splash Pool
  • Ithaca Pool
  • Jindalee Aquatic Centre
  • Jindalee Swim Club
  • Redcliffe Leisure Centre
  • Sleeman/Chandler Sports Complex (Stage 2)
  • Somerset College
  • The Valley Pool Heating
  • Acacia Ridge
  • Acacia Ridge Aquatic Centre
  • Bilolea Swimming Centre
  • Carrara Sports
  • Cleveland Aquatic Centre
  • Gallipoli Army Barracks Aquatic Centre
  • Griffith University Aquatic Centre
  • Redcliff Swimming Pool
  • Runcorn
  • Sandgate
  • Sleeman Aquatic Centre